Home / Glossary / EICR (Electrical Installation Condition Report)

What is EICR (Electrical Installation Condition Report)?

Last verified 4 November 2026

An EICR (Electrical Installation Condition Report) is a report on the safety of a property's fixed electrical installation. Landlords in England must have the installation inspected and tested by a competent person at least every five years.

Why it matters to landlords

An EICR looks at the fixed electrical parts of the property: the wiring, the plug sockets, the light fittings and the consumer unit. It does not cover portable appliances. The inspector tests against British Standard 7671, the Wiring Regulations, and records any faults with a code.

C1 means danger present and C2 means potentially dangerous. Either code makes the report unsatisfactory, and remedial work is required. C3 means improvement recommended: you do not have to make the improvement, and a C3 alone does not stop the report being satisfactory.

If the report shows remedial or further investigative work is needed, you have 28 days to complete it, or less if the report says so. Within 28 days of finishing, give the tenant and the council the report and written confirmation from the person who did the work.

Existing tenants must get a copy of the report within 28 days of the inspection, and new tenants before they move in. A prospective tenant who asks must get one within 28 days, and the council within 7 days of asking. Keep your copy until the next inspection and pass it to the next inspector.

Breaches can lead to a civil penalty from the local council. This is the rule for rented homes in England.

Keep the invoice with your property expense records. If your qualifying income is over £30,000, those records have to be digital from 6 April 2027, which our guide to April 2027 for landlords explains. For renewal dates, there is a simple EICR tracker you can download.

Example

An inspection on 10 March finds a C2 fault at the consumer unit. The landlord gives the tenant a copy of the report and has the fault fixed by 7 April, 28 days later. Within 28 days of that repair, the tenant and the council get the report and the electrician's written confirmation.

EICR requirements for landlords →

Related terms

Related questions

Sources

Keep your certificates and renewal dates in one place

VoxaMTD's paid landlord plans, from £8.99 a month, keep your gas, electrical, EPC, deposit and Right to Rent records on their own renewal cycles, with reminders. Every new account gets a 7-day free trial of the paid features when you sign up, with no card needed.

Try it now →

More compliance and safety terms: Compliance and safety glossary